Considering the geographical location of the project (Al-Sadr town – Baghdad) and the sources of supply of power plant equipment, it was necessary for the equipment to be transported in different ways and through different sources into Iraq. In this project, Besides the transportation operations (by road and sea), Nasr Al-Rafedain Company was also in charge of the process of receiving the approval of documents imported to Iraq in the countries of origin and carrying out the process of customs exemptions.
Project details
- ClientIraqi Ministry of Electricity
- Shipping routesChina - Umm al-Qasr port - Baghdad- Türkiye - Shalamcheh - Baghdad Germany - Ibrahim Khalil - Baghdad
- The number of transported fleet in the entire project1520 trucks
- Approximate weight of the project38,000 tons
- Duration of the project1386-108 months